What it costs in Delta
$45,000 – $150,000 typical range.
- $45,000 – $70,000 — New cabinets, quartz counters, mid-tier appliances, upgraded ventilation. Common in newer Tsawwassen and North Delta builds.
- $70,000 – $100,000 — Wall removal, premium cabinetry, integrated appliances, quartzite counters, improved ventilation system. Standard in older Ladner heritage homes.
- $100,000 – $130,000+ — Custom solid-wood millwork (sealed for humidity), premium stone counters, full appliance package, integrated lighting. Common in Beach Grove and Tsawwassen waterfront homes.
- + $3,000 – $7,000 — Waterfront and near-water Delta homes benefit from additional ventilation, marine-grade hardware, and finishes that handle higher humidity without degrading early.
Ranges reflect typical Naybur pricing in Delta for 2026. Final quote depends on spec, finishes, and site conditions — we provide a fixed-price quote after a free in-home consultation.
Delta permits
How we handle the paperwork.
The Corporation of Delta requires a building permit for any kitchen renovation that moves plumbing, opens walls, or changes electrical loads. Delta's permit process is reliable — typical 2–3 week turnaround. Wall-removal projects need a structural engineer's stamped drawing, which we coordinate. For waterfront properties in Tsawwassen and along the Fraser in Ladner, additional environmental review may apply if work involves exterior changes; rare for interior kitchen renos.
Recent work in Delta
From the portfolio.
More on the full project gallery.
Common questions
FAQ.
How much does a kitchen renovation cost in Delta?
$45,000 to $130,000+ depending on scope. Refresh in a newer Tsawwassen home: $45K–$70K. Full reno in a Ladner heritage home: $70K–$100K. Premium build in a Beach Grove waterfront home: $100K+.
What about coastal humidity?
Delta's coastal climate raises ambient humidity, which can degrade kitchen finishes faster than inland conditions. We use marine-grade hinges, sealed solid-wood cabinetry, and upgraded ventilation to handle it. Quoted upfront, not as an extra-cost surprise.
Do I need a Delta permit?
Yes for any meaningful renovation. We handle the permit, structural engineering if walls come out, inspector visits, and the final close-out.
How long does it take?
Six to ten weeks. Custom millwork drives the schedule. Waterfront homes with additional moisture-management work can run an extra week.
Which Delta neighborhoods do you cover?
Ladner, Tsawwassen, North Delta, Beach Grove, Sunshine Hills, English Bluff, Boundary Beach, East Delta.
Free in-home consult. Anywhere in Delta.
Walk us through the space, tell us what you're imagining, get a fixed-price quote within a few days. No deposit required to book the visit.