Booking now — 10% off decks and bathrooms — Spring Sprint ends June 20.
Spring Sprint ends in --Days : --Hours : --Minutes : --Seconds
Kitchen Remodeling · Burnaby, BC

Kitchen Remodeling in Burnaby.

Naybur Contracting renovates kitchens across Burnaby — Brentwood, Metrotown, Lougheed, North Burnaby, Cariboo, Burnaby Mountain. Burnaby's mix of 1960s split-levels with cramped galley kitchens and newer high-rise condos drives different scope per project. Most Burnaby kitchens land between $45,000 and $150,000, six to ten weeks build. Free in-home consult, fixed-price quote.

What it costs in Burnaby

$45,000 – $150,000 typical range.

Ranges reflect typical Naybur pricing in Burnaby for 2026. Final quote depends on spec, finishes, and site conditions — we provide a fixed-price quote after a free in-home consultation.

Burnaby permits

How we handle the paperwork.

The City of Burnaby requires a building permit for any kitchen renovation that moves plumbing, alters electrical, opens load-bearing walls, or changes the building envelope. Burnaby's permit office is responsive and turnaround is typically 3–4 weeks. For strata buildings (most Brentwood and Metrotown high-rises and townhouses), the strata council letter and building bylaws review come first — we handle both. Wall removal in older split-levels almost always requires a structural engineer's stamped drawing; we coordinate the engineer's site visit and the drawing as part of the project.

Recent work in Burnaby

From the portfolio.

More on the full project gallery.

kitchen renovation in Burnaby — Naybur Contracting kitchen renovation in Burnaby — Naybur Contracting kitchen renovation in Burnaby — Naybur Contracting

Common questions

FAQ.

How much does a kitchen renovation cost in Burnaby?

$45,000 to $150,000+ depending on scope. Refresh in a newer Brentwood condo: $45K–$70K. Wall-removal layout change in a North Burnaby split-level: $70K–$110K. Premium custom build in a Burke Mountain estate: $110K–$150K.

Do I need a Burnaby permit?

Yes for any meaningful renovation. We handle permit submission, inspector visits, structural engineer coordination if walls are coming out, and the final close-out.

Can you remove a wall to open up the kitchen?

Yes — that's one of our most common Burnaby projects. Older split-levels and 1980s townhouses were built with closed galley kitchens that don't suit modern entertaining. We coordinate the structural engineer, the stamped drawing, and the permit, then handle the beam install and finishing.

How long does it take?

Six to ten weeks. Custom millwork drives the timeline — 6–8 weeks lead time on solid-wood cabinetry. Mid-range refreshes with stock or semi-custom cabinets can wrap in five to six weeks.

Which Burnaby neighborhoods do you cover?

Brentwood, Metrotown, Lougheed, North Burnaby, Cariboo, Burnaby Mountain, Burke Mountain, Burnaby Heights, Capitol Hill, Edmonds, Big Bend.

Free in-home consult. Anywhere in Burnaby.

Walk us through the space, tell us what you're imagining, get a fixed-price quote within a few days. No deposit required to book the visit.