"These guys are so amazing and quick. 10/10"
— Megan Young, West Vancouver
See all reviews on Google →Naybur Contracting builds luxury bathroom remodels across West Vancouver — Ambleside, Dundarave, British Properties, Cypress Park, Caulfeild, Whitby Estates, and Chartwell. West Van bathrooms are higher-spec than the inland market: marble counters, designer fixtures, custom millwork are the norm. Most West Van bathrooms land between $50,000 and $150,000, six to ten weeks build. Free in-home consult.
What it costs in West Vancouver
Ranges reflect typical Naybur pricing in West Vancouver for 2026. Final quote depends on spec, finishes, and site conditions — we provide a fixed-price quote after a free in-home consultation.
West Vancouver permits
The District of West Vancouver permit process is more involved than the City of Vancouver's. Any bathroom remodel that touches a load-bearing wall, alters the building envelope, or significantly changes electrical load goes through full review — and for above-highway homes in Chartwell, Cypress Park upper, or Whitby Estates, a structural engineer's stamped drawings are often required before the permit is issued. We coordinate the engineer, the drawings, and the permit submission. For heritage-designated properties in Ambleside or Dundarave, we navigate the heritage review board before submission.
Recent work in West Vancouver
More on the full project gallery.
What West Vancouver customers say
"These guys are so amazing and quick. 10/10"
— Megan Young, West Vancouver
See all reviews on Google →All reviews are verified Google reviews. View Naybur on Google →
Common questions
$50,000 to $150,000 in most cases. Premium guest bath: $50K–$75K. Full master remodel: $75K–$110K. Full spa-level master suite with book-matched stone, steam shower, smart fixtures: $110K+.
Yes — British Properties, Cypress Park, Caulfeild, and Whitby Estates are core service areas. We have experience with the larger-format luxury bathrooms and the District permit nuances for above-highway homes.
Six to ten weeks for most West Van bathrooms. Custom millwork is the long pole — solid-wood cabinetry typically runs 6–8 weeks to fabricate. We sequence rough-in trades during that window so install moves fast.
Heritage-designated properties get coordinated with the heritage review board before permit submission. Above-highway homes that need structural changes get a stamped engineer's drawing as part of the permit. Both are coordinated and quoted upfront, not as billable surprises.
Ambleside, Dundarave, British Properties, Cypress Park, Caulfeild, Whitby Estates, Chartwell, Sandy Cove, Eagle Harbour, Horseshoe Bay, West Bay.
Walk us through the space, tell us what you're imagining, get a fixed-price quote within a few days. No deposit required to book the visit.